Building a new home is an exciting journey, from the first sketches to the final walk-through, every step brings you closer to the home of your dreams. But one of the most common questions we hear at Sortino Properties is, “How long will it take?” The answer depends on several factors, but having a general understanding of the timeline can help set clear expectations and reduce stress along the way.

What to Expect from the Custom Home Building Timeline

While timelines can vary based on home size, weather, design complexity, and permitting requirements, the average custom home build typically takes between 6 and 12 months from breaking ground to move-in day. At Sortino Properties, our goal is always to keep the process smooth and efficient while never compromising on quality.

Let us take a closer look at the typical phases of building a new home and how long each one may take.

A General Breakdown of the Custom Home Timeline

  • Planning and Design (1–2 months): This phase includes working with our team to choose your floor plan, finalize customizations, and secure financing if needed.
  • Permitting (1–2 months): Local municipalities need to review and approve your plans before we can start building. This process can vary depending on where you are building.
  • Site Prep and Foundation (2–4 weeks): Clearing the lot, excavation, pouring the foundation, and setting the stage for construction.
  • Framing (4–6 weeks): Once the foundation is set, we frame the home and this is when your house really begins to take shape.
  • Systems Installation (3–6 weeks): Electrical, plumbing, HVAC, and insulation are installed and inspected.
  • Interior and Exterior Finishes (2–3 months): Drywall, flooring, cabinetry, paint, fixtures, and exterior details like siding and roofing are completed.
  • Final Touches and Inspections (2–4 weeks): We walk through every detail to ensure your home is perfect before move-in day.

Factors That Can Impact Your Home’s Timeline

While we strive to stay on schedule, a few external factors can affect your home’s build time. Such as weather delays like heavy rain, snow, or extreme temperatures. These can slow down construction, especially during framing or foundation work. Material availability as global supply chain issues can sometimes delay specific finishes or appliances. Or change orders, as changes during construction can add time, especially if they require rework or new permits.

The good news? At Sortino Properties, we keep you informed every step of the way. Our experienced team works closely with you to set a clear timeline, manage expectations, and deliver the high-quality home you have envisioned.

Ready to Start the Journey?

If you are thinking about building a home in the Rochester, NY area, we would love to help you bring your vision to life. Contact Sortino Properties today to learn more about our process, explore available lots, or schedule a consultation. Let us build your future, together. Email us through our secure form or give us a call at 585-225-7000 to get started.